# PE-23 — Facility Location

- **Control ID:** PE-23
- **Family:** [PE](/md/families/PE.md)
- **Baselines:** No content available.
- **Enhancement of:** No content available.

## Description

Plan the location or site of the facility where the system resides considering physical and environmental hazards; and For existing facilities, consider the physical and environmental hazards in the organizational risk management strategy.

## Discussion

Physical and environmental hazards include floods, fires, tornadoes, earthquakes, hurricanes, terrorism, vandalism, an electromagnetic pulse, electrical interference, and other forms of incoming electromagnetic radiation. The location of system components within the facility is addressed in \[PE-18\](\#pe-18).

## Implementation guidance

No content available.

## CSF 2.0 subcategories

- [PR.IR-02](/md/csf/PR.IR-02.md) — PR.IR-02

## Related controls

- [CP-2](/md/controls/CP-2.md)
- [PE-18](/md/controls/PE-18.md)
- [PE-19](/md/controls/PE-19.md)
- [PM-8](/md/controls/PM-8.md)
- [PM-9](/md/controls/PM-9.md)
- [RA-3](/md/controls/RA-3.md)

---

Derived from official NIST publications (NIST SP 800-53 Rev 5 and NIST CSF 2.0). nistcontrols.com is not affiliated with NIST.
